您所在的位置:首页 > 暂缓显示 > 人员列表 > 正文

黄跃飞

日期:2014-06-27

研究领域:
1. 基于遥感和GIS的分布式水文模型,区域水资源规划,流域管理。2. 土壤与地下水污染物修复与过程模拟及控制。3. 不确定条件下的环境系统优化。4. 环境风险评价

教育背景:

1999 - 2004 加拿大里贾纳大学环境工程系,博士学位

1996 - 1999 北京大学城市与环境学系,硕士学位

1991 - 1996 清华大学环境工程系,学士学位

1994 - 1996 清华大学自动化系,第二学士学位


工作履历:

2005 - 至今 清华大学水利系,副研究员

研究概况:

1. 城市水和营养物循环机理与演变规律研究(2005CB724202),973课题,课题负责人,在研

2. 基于中试实体模型的地下水污染修复系统三维模拟和过程控制研究(50509010),课题负责人在研

3. 南水北调中线工程长距离调水水量及水力的调配与控制研究(JGZXJJ2005-22),已结题

4. 国家自然科学基金委创新群体项目(50221903),在研

5. 清华大学基础研究基金((JCQN2005008),在研

6. 海底管线泄漏应急抽油控制技术研究,课题负责人,在研

学术成果:

1. Y. F. Huang, G. Q. Wang, G. H. Huang, H. N. Xiao, and A. Chakma, IPCS: An Integrated Process Control System for Enhanced In-Situ Bioremediation, (SCI), 2007 (In Process).

2. Y. F. Huang, G. H. Huang, A. Chakma, I. Maqsood, B. Chen, J. B. Li, and Y. P. Yang, Remediation of petroleum-contaminated sites through simulation of a DPVE-aided cleanup process: Part 1. model development, Energy Sources Part A: Recovery, Utilization, and Environmental Effects (SCI, EI), 2007, 29(4), 347-365, DOI: 10.1080/15567030600904460.

3. Y. F. Huang, G. H. Huang, H. N. Xiao, A. Chakma, Q. G. Lin, and H. Xu, Remediation of petroleum-contaminated sites through simulation of a DPVE-aided cleanup process: Part 2. remediation design, Energy Sources (SCI, EI), Part A: Recovery, Utilization, and Environmental Effects (SCI), 2007 , 29(4), 367-387, DOI:10.1080/15567030600904460.

4. Y. F. Huang, G. H. Huang, G. Q. Wang, Q. G. Lin and A. Chakma. An integrated numerical and physical modeling system for an enhanced in situ bioremediation process, Environmental Pollution (SCI), Volume. 144, Issue. 3, Pages 872-885 (December 2006).

5. Huang, G. H., Y. F. Huang, G. Q. Wang, H. N. Xiao Development of a forecasting system for supporting remediation design and process control based on NAPL-biodegradation simulation and stepwise-cluster analysis, Water Resources Research (SCI,EI), 2006, 42, doi:10.1029/2005WR004006.

6. J. B. Li, G. H. Huang, G. M. Zeng, I. Maqsood, and Y. F. Huang (2007). An integrated fuzzy-stochastic modeling approach for risk assessment of groundwater contamination, Journal of Environmental Management (SCI), 82:173-188.

7. Qin X. S., G. H. Huang, Y. F. Huang, G. M. Zeng, A. Chakma, and J. B. Li (2006). NRSRM: a decision support system and visualization software for the management of petroleum-contaminated sites, Energy Sources: Part A (SCI,EI), 28: 199-220.

8. Y. P. Li, G. H. Huang, S. L. Nie, and Y. F. Huang (2006). IFTSIP: interval fuzzy two-stage stochastic mixed-integer linear programming: a case study for environmental management and planning, Civil Engineering and Environmental Systems (SCI,EI), 23(2): 73-99.

9. 黄跃飞,王光谦,魏加华,大型调水工程干渠输水的水力优化分配,南水北调与水利科技,2006,4(6): 47-50.

10.傅旭东,刘婉婷,黄跃飞,加利福尼亚州调水工程对生态环境的负面影响,南水北调与水利科技,2006,4(6): 44-46.

11.王光谦,黄跃飞,魏加华,吴保生,南水北调中线工程总干渠糙率综合论证,南水北调与水利科技,2006,4(1): 8-14.

奖励与荣誉:

美国土木工程协会(ASCE)2003年最佳论文奖


栏目类别